1. Remove the Scopeguard® from the outer pouch. Place the Scopeguard® onto a sterile field. Grip the Scopeguard® housing between thumb and forefingers and gently insert the Cystoscope into the Scopeguard® sheath.
2. Ensure cystoscope locates inside the Scopeguard® sheath both at the tip and the housing.
3. Attach the irrigation set as required to the port on the Scopeguard® housing. It is recommended for complete sterility that the scope body and associated camera light cable are also protected with a suitable camera drape / sleeve affixed to the flexible section of the Scopeguard® housing.
Post cystoscopy procedure
4. Remove irrigation tubing from the port on the Scopeguard® housing. If a camera sleeve is fitted, this should be removed with the Scopeguard® ensuring that the Cystoscope is not contaminated.
5. Grip the Scopeguard® housing firmly between thumb and forefingers and twist to loosen the Scopeguard® housing from the Cystoscope.
6. Grip the tip of the Scopeguard® sheath between the thumb and forefinger and carefully remove the Cystoscope from the Scopeguard®. Dispose of the Scopeguard®.